|
The Production Technique
The delivery of Twintec products relies upon properly specified raw materials, proven production methods, experienced personnel and specially adapted equipment & tools. Levelness and flatness surveys are contracted to independent external companies.
In addition to an advanced understanding of steel fibres in concrete...
1. Sub base preparation |
2. Joint installation |
3. Steel fibre integration |
4. Levelling of the concrete
|
5. Topping spreader |
6. Polishing and dry-shake incorporation |
7. Control of tolerances
|
8. Finished product
|













